Singapore · Vietnam · China

One Partner.
Two Countries.
Zero Supply Chain Risk.

DEWIN sources custom mechanical parts and assemblies from vetted factories in Vietnam and China -- giving US and European customers a built-in Plan B without managing two supplier bases.

$8M+
Revenue 2025
300+
Vietnam Factories
±0.005mm
CNC Tolerance
Est. 2011
Singapore HQ
CNC Machining Die Casting Stamping & Welding Bending & Laser Cutting Injection Molding Assembly & Testing
ISO 9001:2015 -- Bureau Veritas Certified Alibaba Verified Supplier Established 2011 -- 15 Years Singapore · Vietnam · China · 28 Experts Clients: Bombardier · Samsung · Thyssenkrupp ISO 9001:2015 -- QMS Certified Alibaba Verified Supplier Established 2011 -- 15 Years Singapore · Vietnam · China · 28 Experts Clients: Bombardier · Samsung · Thyssenkrupp

The Problem with Your Current Supply Chain

Sound Familiar?

Procurement managers at US and European manufacturers tell us the same story. Their suppliers look good on paper -- until production starts.

Get a Second Opinion on Your Parts

Repeated Sample Rejections

Suppliers miss critical drawing requirements. You're stuck in costly rework loops before production even begins.

Delivery Delays Without Warning

No proactive updates, no early alerts. You find out about delays when your production line is already waiting.

China-Only Supply Chain Risk

With US tariffs on Chinese goods at 45%+, a single-country strategy is no longer viable. You need a Plan B -- now.

No Structured QC Documentation

Suppliers can't provide PPAP, COA, or dimensional reports. Your quality team is left guessing.

Vietnam + China Dual Sourcing

The Only Partner Covering
Both Countries.

Split production between Vietnam and China based on cost, tariff exposure, capacity, or geopolitical risk -- managed by a single point of contact.

Vietnam

Ho Chi Minh City

🇻🇳
  • No US tariff exposure -- Vietnam-origin goods exempt from China Section 301 tariffs
  • 300+ vetted factories across metal, plastic, and assembly
  • Local Vietnamese team -- zero language barriers with factories
  • Full migration in as fast as 10 months -- 6 completed projects
7
Local Staff
9
VN Projects
150+
Audited
China

Xi'an Office

🇨🇳
  • Deepest manufacturing base -- unmatched process breadth and capacity
  • 21-person Xi'an team -- engineering, QC, and logistics expertise
  • Powder metallurgy, precision machining, and complex multi-process assemblies
  • Ideal for high-mix low-volume parts requiring deep engineering support
21
CN Staff
15yr
Experience
90
Net Days

US Tariffs on Chinese Goods: 45%+ and Rising

Procurement managers relying solely on China are absorbing margin losses. DEWIN's dual-sourcing model lets you split production strategically -- without doubling your supplier management overhead.

Build Your Plan B

Full-Scope Manufacturing Services

From Drawing to Delivery.
One Partner.

DEWIN is not a factory. We're your engineering-backed supply chain team -- matching each project to the right factory, then managing quality, logistics, and documentation end-to-end.

CNC Precision Machining

Turning, milling, and grinding for complex geometries. Steel, aluminum, titanium, brass, and engineering plastics.

Tolerance
±0.005mm

Die Casting

Aluminum and zinc alloy die casting with high-life tooling. Ideal for complex housings and brackets at volume.

Mold Life
300K-1M shots

Stamping, Bending & Welding

Sheet metal fabrication for brackets, enclosures, and structural assemblies. Progressive and transfer die tooling available.

Tolerance
±0.05mm

Plastic Injection Molding

Engineering-grade plastics: PA, POM, ABS, PC, and PEEK. Insert molding and overmolding available.

Tolerance
±0.02mm

Dolphin Services®

Registered

One-stop trade service: factory audits (QCLDM scoring), PPAP documentation, in-process QC, final inspection, and door-to-door logistics.

Migration Timeline
As fast as 10 months

China → Vietnam Migration

Proven playbook to relocate full production lines. Vietnamese team communicates directly with local factories -- no language barriers.

Network
300+ Vetted Vietnam Factories

How We Work

Engineering-Backed from Day One

  1. 1

    RFQ & DFM Review

    Submit drawings. Our engineers review for manufacturability issues before quoting -- catching problems that cause sample rejections later.

    Response within
    24 Hours
  2. 2

    Factory Matching

    We score factories using our QCLDM audit system -- Quality, Cost, Lead time, Delivery, Management -- and match your project to the optimal supplier.

    Audit system
    QCLDM Scoring
  3. 3

    In-Process QC

    Our local team monitors production at the factory, not just final inspection. First Article Inspection, in-process checks, and dimensional reports included.

    Documentation
    Full PPAP Package
  4. 4

    Door-to-Door Delivery

    We handle freight, customs documentation, and last-mile logistics. You receive parts, COA, PPAP package, and invoice in one shipment.

    Payment terms
    Up to Net 90 days

Trusted by Global Manufacturers

BOMBARDIER
Canada · Recreational
SAMSUNG
Smart Lock Components
THYSSENKRUPP
Bilstein · Germany
GT GROUP
United Kingdom
US CLIENTS
Logistics · Hardware
DEWIN identified three critical tolerance issues in our drawings before production started. That alone saved us two rounds of sample rejection and at least six weeks of lead time. Their Vietnam team communicates like a local -- because they are.
TK
Procurement Director
Automotive Tier 1 Supplier · Germany

Why DEWIN

Not a Factory.
Your Supply Chain Team.

DEWIN acts as your embedded procurement and engineering team in Asia. We don't just find suppliers -- we qualify them, monitor production, handle documentation, and deliver to your door.

Only Partner Covering Vietnam AND China

One contract, one contact, two countries. Split production strategically without managing multiple supplier relationships.

DFM Review Before Every Quote

Our engineers catch drawing issues before production starts. This is why our clients report fewer sample rejections and shorter time-to-production.

Vietnamese Team in Vietnam

7 local Vietnamese staff communicate directly with factories in their native language. Zero translation gaps, zero miscommunication.

Net 90 Payment Terms Available

Flexible O/A terms up to 90 days protect your cash flow while production is underway -- rare if you work with factories directly.

$8M+
Revenue 2025
300+
Vietnam Factories
28
Expert Team
15yr
Est. 2011

Certifications & Verification

ISO 9001:2015
QMS Certified
Alibaba Verified Supplier
Gold Supplier Status
Singapore HQ
Established 2011 · ACRA Registered

Get A Solution in 24 Hours

Ready to Secure
Your Supply Chain?

Share your part drawings and requirements. Our engineering team will review for manufacturability and send you a timeline within 24 hours -- no commitment required.

Free DFM review included with every quote
Response within 24 business hours
NDA available upon request before sharing drawings
Vietnam and China sourcing options compared side-by-side
Payment terms up to Net 90 days O/A

Submit Your RFQ

We'll review and respond within 24 hours.

Accepted: PDF, DWG, DXF, STEP, IGES, JPG, PNG, ZIP, DOC, XLS — single file up to 100 MB

No commitment required. NDA available on request.