Factory Code | Location | Established | Number of Workers | Floor Area (O) | Min tolerance of precise machining | Certification | General lead time | Most competitive products |
---|---|---|---|---|---|---|---|---|
DWS2024224 | Long An | 2020 | 346 | 33000 | Follow DIN ISO 2768-mk | Tooling 30days, Sample 30days, Batch 30 days. | Steel pipe, Low Arm Forklift, Stamping and welding products, Aluminum casting products | |
DWS2025596 | Binh Duong | 2018 | 500 | 30000 | ISO 2768-mk | ISO 9001 | Tooling 30days, Sample 30days, Batch 30 days. | Smart bed and cabinet interior details |
DWS2024281 | Bac Ninh | 2010 | 133 | 15000 | ISO 2768-mk | ISO 9001/ISO 14001 | Tooling 30days, Sample 20 days, Batch 30 days. | Hand pallet truck |
DWS2024315 | Binh Duong | 82 | 6000 | ISO 286-1:1988 | ISO 9001 | Tooling 45days, Sample 20 days, Batch 60 days. | Wire Steel Bending parts, Precision parts | |
DWS2025597 | Binh Duong | 2012 | 200 | 5000 | 0.007 mm | ISO 9001 | Tooling 30, Sample 15 days, Batch 30 days. | Furniture accessories (handle, hinge, sliding ray, bolts, screws, latch) |
DWS2024256 | Ho Chi Minh city | 2022 | 16 | 5000 | ISO 2768-mk | Tooling 30days, Sample 20 days, Batch 30 days. | Stamping component for furniture, car | |
DWS2024365 | Vinh Phuc | 2022 | 64 | 4800 | Follow ISO 2768 | ISO 9001 | Tooling 30day, Samples 30 days, Batch 30 days. | Sheet metal forming parts, Frame fabrication parts |
DWS2025607 | Dong Nai | 2016 | 45 | 4000 | 0.05 mm | Tool: 45 days Sample: 30 days Batch: 45 days | Machine frame | |
DWS2025614 | Ho Chi Minh city | 2003 | 30 | 4000 | 0.05 mm | Tooling 45 days, Sample 30 days, Batch 30 days. | Shell of electronic equipment (computer, speakers) | |
DWS2025606 | Ho Chi Minh city | 2013 | 35 | 3500 | 0.05 mm | Tool: 45 days Sample: 30 days Batch: 45 days | Sheet metal product (machine, electrical, construction) | |
DWS2025589 | Long An | 2019 | 86 | 3000 | 0.08 mm | Tool: 45 days Sample: 30 days Batch: 45 days | Speaker cover | |
DWS2024466 | Ho Chi Minh city | 2015 | 20 | 2500 | 0.05 mm | Tool: 45 days Sample: 30 days Batch: 45 days | Sheet metalHook (S, J) | |
DWS2025600 | Dong Nai | 2018 | 20 | 2500 | 0.05 mm | ISO 9001 | Tool: 45 days Sample: 30 days Batch: 45 days | Mechanical parts (stamping product) |
For more information, please contact us.
In addition, as long as you have requirements and drawings, we can produce corresponding lawn mower accessories for you.We will select the appropriate factory and production process for you based on the drawings and material requirements.
We will contact you within 1 working day, please pay attention to the email with the suffix “@dewintech.com”.
Your privacy is safe, we won’t use your email for any other purposes.